The hydropower company is currently constructing a 26-megawatt hydropower project in Khudi.
Mirmire Laghubitta Bittya Sanstha Limited (MMFDB) has cancelled the previously declared 6.32 percent dividend
Puwakhola–One Hydropower Limited operates a 4-megawatt hydroelectric project located in Ilam district.
The 30th annual general meeting of HEI is scheduled for Thursday, the 25th of Magh.
Despite economic challenges, the insurance sector, especially life insurance, has shown resilience and growth.
The application period for the IPO of Sarbottam Cement has ended today.
Annual General Meeting (AGM) set for 1st Falgun, 2080.
ICRA Nepal maintains Sarbottam Cement's issuer rating at BBB+.
The issued capital of the company is 1.90 Arba.
The LTP of the company is at 905 today after a decrease of 16.20 points yesterday.
.. ..
सामाजिक संजाल
Artha Kendra
सूचना विभाग दर्ता नं. : ४१९७-२०८०/२०८१
प्रधान सम्पादक : दिपेश खनाल
मार्केटिङ : +९७७ ९८४७८५४३२८
2024 arthakendra.com All Rights Reserved.